Call Us Today!
02 40234578For the past seven years, Engineering Fabricators Newcastle have assisted W.A. Brown Building with the preparation and fabrication of structural steelwork and precast concrete. Their services include detail drafting and scheduling, supply and fabrication. Their services have very much been a contributor to the success of our company.
We have always been completely satisfied with the quality of work provided by Engineering Fabricators Newcastle through the excellent professionalism and reliability that has been provided to our company. Engineering Fabricators Newcastle is one of the best in the business and we believe their services are valuable to any company.
I make no hesitation in recommending Engineering Fabricators Newcastle for any upcoming projects.
Wayne Brown – Director – W.A Brown Building Pty Ltd
Engineering Fabricators Newcastle has assisted Chappell Building Systems, showing both excellent professionalism and reliability with their services. Their services include detail drafting of structural steel and precast concrete panels, scheduling, supply and fabrication of structural steel and installation of metal work items.
From tender stage to final product – we have found Engineering Fabricators Newcastle a pleasure to engage with, both in knowledge and a “Can Do” approach to any project. The service that Engineering Fabricators Newcastle provides is beyond reproach.
I do not hesitate to recommend Engineering Fabricators Newcastle for any future projects.
Chris Chappell – Director – Chappell Building Systems
Hansen Yuncken would engage Engineering Fabricators Newcastle again to complete structural steel works based on their outstanding quality, attention to detail on site and their overall ability to complete works as programmed.
Hansen Yuncken was satisfied with safety requirements required to be completed prior to commencing works on site and ongoing safety throughout the project. The timely manner of all the administration requirements of Engineering Fabricators Newcastle also ensured that works were able to commence as programmed and to be closed out as soon as the job is completed.
Louise Morrison – Contract Administrator – Hansen Yuncken